The analize of waste elimination on sa contact block to increased the output by lean manufacturing method (studi case: pt schneider electric)

HIGHLIGHTS

  • What: Research methods PROCESS FLOW BEFORE IMPROVEMENT S/A CASE This research has been carried out at PT. The following is Process, Output and MTM data on S/A monoblock On the analysis step, the Gemba walk method is used, a method that is a search carried out while walking through the 289 BACK END 73% for monoblock and 74% for modular. Improve At this stage, the authors provide solutions to problems that have been discovered in the previous gemba walk.
  • Who: Endang Susanti from the (UNIVERSITY) have published the research: THE ANALIZE OF WASTE . . .

     

    Logo ScioWire Beta black

    If you want to have access to all the content you need to log in!

    Thanks :)

    If you don't have an account, you can create one here.

     

Scroll to Top

Add A Knowledge Base Question !

+ = Verify Human or Spambot ?