HIGHLIGHTS
- who: Lowari Tunnel et al. from the Centre of Excellence in Geology, University of Peshawar, Peshawar, PakistanSciences, and Kapodistrian University of Athens, Panepistimiopolis, Zografou, Athens, Greece have published the research work: Operation Stages of Long Tunnel: A Case Study of, in the Journal: (JOURNAL) of 17/06/2022
- how: Following tunnel blasting the data were obtained within 250 m of the working face. The velocity data were obtained between 1 September and 30 September 2016 between 1 June and 30 September 2017 as well as between 8 February and 28 February 2018.
SUMMARY . . .