HIGHLIGHTS
- who: Nurul Arifah from the Universitas , Agustus, Surabaya, Indonesia have published the research work: Analysis of Time and Cost Control Using The Earned Value Method In Well Pad Hilling and Compacting Work In The PT. Pertamina Hulu Rokan Riau Province, in the Journal: (JOURNAL) of 12/07/2022
- what: The aim of this study was to determine the time and cost performance of the Well Pad filling and compaction project in the Rokan Riau Oil and Gas Block, and to determine the estimated cost and final project completion time.
SUMMARY
Calculation . . .

If you want to have access to all the content you need to log in!
Thanks :)
If you don't have an account, you can create one here.