HIGHLIGHTS
- What: At present, the main purpose of an actual project is to fill the core of a pile, and longitudinal bars are anchored to the bearing platform. The main focus is on bending-shear combination force, with reference having studied the case of compression-bending-shear combination force. Similarly, the prope During the model validation itprocess, the same material During the modelend validation process, the same material prestressing force at the concrete of the pile body is approximately 0.14 MPa, and, in prop foot-scale tests are8.40 used characterize the concrete and reinforcing stee the . . .
If you want to have access to all the content you need to log in!
Thanks :)
If you don't have an account, you can create one here.