HIGHLIGHTS
- who: Ting Jiang and collaborators from the Hydropower Stations in China State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Hohai University have published the paper: Carbon Footprint Assessment of Four Normal Size, in the Journal: (JOURNAL)
- what: In this study carbon footprints during a dam's lifespan are assessed for Shimen hydropower station (installed capacity 95 MW), Jilebulake (160 MW), Sinan River (201 MW) and Pankou (500 MW).
- how: In this study G-res tool v1.12 launched on 6 February 2018 is used.
- future: The interaction between dams . . .
If you want to have access to all the content you need to log in!
Thanks :)
If you don't have an account, you can create one here.