Construction and cost analysis of bladebridges made from decommissioned frp wind turbine blades

HIGHLIGHTS

SUMMARY

    The scale of EOL blade waste makes it an especially concerning issue, as there will be an estimated cumulative total of 43 million tonnes of blade waste worldwide by 2050 if no blades are While it sounds self-explanatory that blades need to be obtained before any repurposing design work can begin, obtaining decommissioned wind blades is not trivial, even though many blades are stockpiled. While it sounds self-explanatory that blades need to be obtained 3 of 15 before any repurposing design work can begin, obtaining decommissioned wind blades is not trivial, even . . .

     

    Logo ScioWire Beta black

    If you want to have access to all the content you need to log in!

    Thanks :)

    If you don't have an account, you can create one here.

     

Scroll to Top

Add A Knowledge Base Question !

+ = Verify Human or Spambot ?