- who: Hassan Danial from the Department of Built Environment Studies and Technology, Faculty of Architecture, Planning Malaysia have published the paper: Cost Overruns in Engineering Procurement The Importance of Resource Allocation (5M) 2022), in the Journal: (JOURNAL)
- what: This study was aimed to examine the importance on management of resource allocation control from cost overruns specifically in and projects as a preliminary study. Among the importance that contribute to project controlled are spending within budget financial control meeting project value optimizing usage of materials sufficiently manage machinery and manpower to match project goals. For conclusion . . .