- who: e804034 from the After the water system's construction, the operations and maintenance of the system was performed and funded by EDUSC entirelyDay-to-day operations were handled by a handful of trained Haitians but any major tasks were handled by members of EDUSC in the United States. A thorough reassessment of the Cange water system was not performed until , when an engineering team from EDUSC travelled to Haiti to examine issues with the pumping system. These engineers concluded that the water system was at risk of total failure. The pump was past its life expectancy . . .