HIGHLIGHTS
- who: Borna Dasović and Uroš Klanšek from the Faculty of Civil Engineering, Transportation Engineering and Architecture, University of Maribor have published the research: Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling, in the Journal: Sustainability 2021, 12173 of 18/09/2021
- what: The study shows achievements in integrating heuristic methods, mathematical programing, and special solving methods with conventional PMT and optimizationbased building information modeling (BIM) tools. Some of the studies investigated the optimization of project schedules based on spreadsheets , but this approach has some limitations . . .