Method for determining the number of maintenance personnel

HIGHLIGHTS

  • What: In this study, the method is developed under the assumption that the arrival distance between maintenance jobs is assumed to follow the Weibull distribution, and the completion time of maintenance work is considered to follow the lognormal distribution.
  • Who: -Maintenance and collaborators from the Mechanical and Industrial Engineering, Gadjah Mada University, Yogyakarta, Indonesia have published the research: Method for Determining the Number of Mechanical and Industrial Engineering Gadjah Mada University, in the Journal: (JOURNAL)
  • How: At the time the data was collected there were a total of 6 workers divided into two . . .

     