HIGHLIGHTS
- What: The aim of this research project is to enhance scheduling methods for planning building construction projects. This project is intended to develop a graphical protocol for modeling site occupancy rates based on information that managers can easily obtain when planning a construction project, so an empirical approach based on design-science concepts was developed. One of the first objectives of this research is to know how these five resources types are used during daily operations on a construction site. The aim of this parameter is to indicate whether other OTs may be present in the same . . .