Multi-objective assembly line balancing problem with setup times using fuzzy goal programming and genetic algorithm

HIGHLIGHTS

  • who: Amy H. I. Lee et al. from the Department of Industrial Engineering and Management, National Chin-Yi University of Technology have published the research work: Multi-Objective Assembly Line Balancing Problem with Setup Times Using Fuzzy Goal Programming and Genetic Algorithm, in the Journal: Symmetry 2021, 333 of /2021/
  • what: In this study, new approaches are presented using fuzzy multi-objective linear programming and genetic algorithm. A preemptive (lexicographic) mixed integer goal programming model for precise goals was developed first, with minimizing the number of mated stations as the primary objective and minimizing the . . .

     

    Logo ScioWire Beta black

    If you want to have access to all the content you need to log in!

    Thanks :)

    If you don't have an account, you can create one here.

     

Scroll to Top

Add A Knowledge Base Question !

+ = Verify Human or Spambot ?