Optimized configuration and operation of isolated microgrid systems for rural electrification: baron technopark

HIGHLIGHTS

  • What: The study shows that by slightly increasing the capital cost of PV system procurement it can reduce the operating cost of $629 from the base system in the long term. The focus of this study is to optimize the existing microgrid system during the operational phase. In this investigation, the integration of photovoltaic (PV) technology into a system with a capacity of 5.3 kWp, referred to as scheme A, was conducted to enhance system reliability in accordance with established criteria, specifically aimed at reducing diesel fuel operational expenses $511 and diminishing net present cost (NPC . . .

     