HIGHLIGHTS
- who: cairo from the Faculty of Electrical Engineering, Johor Bahru, Johor, Malaysia have published the Article: Sebuah Kajian Pustaka:, in the Journal: (JOURNAL) of Feb/16,/2018
- what: The analysis presented shows that a potential operational cost savings of 21.6 $/MW 20 $/MW and 11.1 $/MW is feasible under each of the represented scenarios respectively. The main focus of the exiting methods is to improve the computational speed and solution quality. In this study, the main objective is to efficiently minimize the total operation cost (TOC) over the scheduling period. The UC problem . . .
If you want to have access to all the content you need to log in!
Thanks :)
If you don't have an account, you can create one here.