HIGHLIGHTS
- who: Qiang Zeng and colleagues from the School of Energy Science and Engineering, Henan Polytechnic University, Jiaozuo, China have published the research work: Sequential Scheduling Method for FJSP with Multi-Objective under Mixed Work Calendars, in the Journal: (JOURNAL)
- what: Algorithm complexity, and obtain a better Pareto solution set.
SUMMARY
After the scheduling scheme is obtained, the time is mapped to the Processes 2019, 7, 888; 2 of 31 calendar time through "integral translation". In the third case, the start and stop time of process is arranged according to the work . . .