- who: Lao Jinxu and colleagues from the Shandong Electric Power Research Institute, ShanDong Province JiNan, China have published the Article: Study on power load adjustment capacity of a 300MW cogeneration unit in heating season, in the Journal: (JOURNAL)
SUMMARY
To heating system The heating steam extraction of the four units in the plant is the exhaust steam extraction of intermediate pressure cylinder, and there is no industrial steam. The steam extraction of the unit is sent to the corresponding heat network heater through the steam extraction pipeline to heat the circulating water of . . .