HIGHLIGHTS
- who: March et al. from the Huaqiao University, China have published the article: Study on rock-breaking ef ciency evaluation of TBM disc cutters based on Rostami prediction equations, in the Journal: (JOURNAL)
- what: The main reason is that the rock slag generated in the rock-breaking process is irregular.
SUMMARY
With the expansion of the scale of urban subway construction, the shield Tunnel Boring Machine (TBM) tunnelling method has become the primary construction method for urban underground railway tunnels, owing to its good adaptability, low environmental interference, high efficiency and . . .
If you want to have access to all the content you need to log in!
Thanks :)
If you don't have an account, you can create one here.