HIGHLIGHTS
- who: Zhong Ziwei and collaborators from the Grid Shandong Electric Power Research Institute, Jinan, China have published the article: Test and Research on Load Capacity of a 210MW Unit in Heating State, in the Journal: (JOURNAL)
- what: During the test of the unit #3, the minimum external heating steam extraction flow is 259.227t/h, and the corresponding unit electrical load is 78.36MW MW;
SUMMARY
The rated main steam pressure of this type of turbine is 12.75MPa, the rated main steam temperature is 540℃, and the rated reheat steam . . .
If you want to have access to all the content you need to log in!
Thanks :)
If you don't have an account, you can create one here.