SUMMARY
In the moderate climate of Hungary, a direct linkage between the geothermal energy storage and heat exchanger in the building enclosure was not sufficient to satisfy the building code. This project, which started in 2008, included many details typically not considered in standard Canadian construction, e_g, heat recovery from hot water pipes when delivering it to the gray water container. If, for the sake of administration policy, one aspect, e_g, energy efficiency, is stressed while others are neglected, the whole technology becomes unbalanced. The air response of a building is different for small, mid . . .